Vis enkel innførsel

dc.contributor.authorKeprate, Arvind
dc.contributor.authorKumar, Gaurav Thakur
dc.date.accessioned2021-01-28T10:32:29Z
dc.date.accessioned2021-03-05T09:34:33Z
dc.date.available2021-01-28T10:32:29Z
dc.date.available2021-03-05T09:34:33Z
dc.date.issued2020-01-12
dc.identifier.citationKeprate A, Kumar: Use of Analytical Hierarchy Process in Selecting the Optimum Equipment for Execution at a Construction Project. In: IEEE .. 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), 2020. IEEE p. 1022-1026en
dc.identifier.isbn978-1-5386-7220-4
dc.identifier.isbn978-1-5386-7221-1
dc.identifier.urihttps://hdl.handle.net/10642/9878
dc.description.abstractThere are plethora of issues associated with construction project management process, the most important being the selection of the optimum equipment for execution at a construction site. Different people have different choices based on their experience. Due to this Analytic Hierarchy Process (AHP) can contribute a lot to the resolution of this issue and many other Project Management issues where opinion of everyone should be considered and given importance. This study uses AHP methodology to rank the most important criteria for equipment selection and then performs the cost-benefit analysis. Initially, weightage of each criteria is calculated which is later used for the calculation of total benefits of each equipment. Comparative assessment based on the analysis proposes the optimum equipment for construction project. An illustrative case study is performed within which the hierarchy tree format is developed. Thereafter, a questionnaire is prepared which takes expert judgment into account and finally the results of AHP analysis are coupled with cost benefit analyses to recommend the optimum machinery for construction projects.en
dc.language.isoenen
dc.publisherIEEEen
dc.relation.ispartof2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
dc.relation.ispartofseriesIEEE International Conference on Industrial Engineering and Engineering Management; 2020 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM)
dc.rightsAn author is expressly permitted to post any portion of the accepted version of his/her own IEEE-copyrighted articles on the author’s personal Web site or the servers of the author’s institution or company .en
dc.subjectConstruction equipmentsen
dc.subjectAnalytic hierarchy processen
dc.subjectCost-benefit anaylsesen
dc.titleUse of Analytical Hierarchy Process in Selecting the Optimum Equipment for Execution at a Construction Projecten
dc.typeChapteren
dc.typePeer revieweden
dc.typeConference proceeding
dc.date.updated2021-01-28T10:32:29Z
dc.description.versionacceptedVersionen
dc.identifier.doihttps://doi.org/10.1109/IEEM45057.2020.9309732
dc.identifier.cristin1879996
dc.source.isbn978-1-5386-7220-4


Tilhørende fil(er)

Thumbnail

Denne innførselen finnes i følgende samling(er)

Vis enkel innførsel